Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Teal
Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.
Priced per 1,000 g
Please Note: The color may be slightly different from the picture because of different display device.
Size | 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g |
Material | Maple Wood |
Color | Teal |
Shape | Oval |
Usage | Beads |
Package Size | 1,000 g per package |
Share your thoughts with other customers and get lbeads points.
Search by Image
·Search kbeads with an image instead of text. Try dragging an image here.
Uploading File