• Price/Package: US $8.87
  • Sorry, the item is temporarily removed from LBeads because it's out of stock.
    If you have any questions, please feel free to contact us.

Product Description

Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Teal

Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note: The color may be slightly different from the picture because of different display device.

Specification Size Info

Size 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g
Material Maple Wood
Color Teal
Shape Oval
Usage Beads
Package Size 1,000 g per package

Customer Reviews

Share your thoughts with other customers and get lbeads points.

Customer Questions

Stay Connected


Confirm

Please Note

OK

Please Note

OK

Search by Image

·Search kbeads with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File